Innovation Process (basic)
Posted by: iDrafted on 03-10-2012
This is a test forum for a standard discussion template. iDrafted is designed to optimize productive discussions:
-Specific areas are provided for each discussion phase (click on the name to open/close the area).
-Areas focus the discussion (the post should relate to both topic and area)
-Within each area, different reply types are provided to refine focus.
-Reply: general comments
-Suggest: ideas on improvement
-Dispute: demands for clarification and/or correction
This approach means that one group may focus solely one one area of the project or one aspect (like suggestions or disputes) with ease.
<< o >> Rate this post + move -
Posted by: iDrafted on 03-06-2012
nice example of a problem from Reddit:
Manufacturing question: How to reduce rejection rate, currently 20% (self.engineering)
submitted 2 hours ago by ebaker1982
<< o >> Rate this post + move -
Posted by: Anonymous on 03-06-2012
[–]I_am_Bob 2 points 1 hour ago
Does your plant have any ISO certifications? They would require a quality control procedure be in place. Depending on what you\'re manufacturing that may be something to consider. And definitely put an engineer on the project whether internal or an outside hire. Finally give the line workers a way to communicate issues. Feedback from the operators can be really valuable in finding production issues.
<< o >> Rate this post + move -
Posted by: Anonymous on 03-09-2012
www.reddit.com
<< o >> Rate this post + move -
Posted by: Anonymous on 03-09-2012
Reddit: www.reddit.com
<< o >> Rate this post + move -
Posted by: Anonymous on 03-09-2012
reddit.com
<< o >> Rate this post + move -
close